Design Team leader
Project Management
Building Services Engineering
Civil & Structural Engineering
Cost Management
Service
Value
€4.33 million (combined)
Design
18 weeks
Procurement
06 weeks
Build
20 weeks
Stage
Complete
Footprint
c.500 sq. m.
Project Deliverables
Detailed site Surveys and generation of BIM Model
Scheme and Detail Design Reports and Presentation
Hazard Analysis & FMEA
Value Engineering
Budget Cost Analysis at each Design Phase
PSDP and Preliminary SHW Plan
Building Control & Fire Engineering
Procurement/Contract Strategy
Tender Process & Report
IFC Documentation
Administration of Contracts
Support for Site Operations
Snagging/Handover
Final Account Negotiation
Safety File and O&M Presentation
This investment was a major intervention project comprising modifications and upgrades to existing Solutions Laboratory, Testing Laboratory, Tank Room, Fill Suite and associated accommodation. The works also included provision of Lean Lifts, Freezer/Coolers, Mix Tank, LAF’s, BSC’s, Bench Work with associated Room Fabric, HVAC Systems and Utilities upgrade.
Overview
The projects comprised critical production related intervention works at two interdependent sites by our client and managed as two separate projects.
The benefit of engaging Taylor Group for design and site operations was the fact that we delivered both projects with the same team members which had a positive influence on the projects from the perspective of the transfer and sharing of knowledge. Strong site engineering teams supported by Taylor Group managed the successful delivery of the projects on time and budget.